Project Reference


Electric System


CLIENT: MAJLIS PEMBANDARAN KLANG

YEAR:

PROJECT:

Membekal & memasang lampu Higt Mast 25 meter dikawasan letak kereta Kompleks Sukan Pendamaran.

VALUE OF CONTRACT: RM 106,237.00

CLIENT: CONCORD INN HOTEL

YEAR:

PROJECT:

Recalibration Work for LT Substation, Gen-set and sub switch board.

Installation & Testing KWH Meter

VALUE OF CONTRACT: RM 20,000.00

CLIENT: ISTANA BUDAYA KUALA LUMPUR

YEAR:

PROJECT:

Kerja-kerja membaiki kerosakan system pendawaian Elektrik di bengkal senireka

VALUE OF CONTRACT: RM16,500.00

CLIENT: UiTM SHAH ALAM

YEAR:

PROJECT:

Kerja-kerja Pendawaian elektrik dan pemasangan lampu jalan di perpustakaan PTAR 1 & 2.

VALUE OF CONTRACT: RM15,000.00

CLIENT: MARDI, SERDANG

YEAR:

PROJECT:

Kerja-kerja Pendawaian,pemasangan untuk 2 tingkat banguna Block E Ibu pejabat MARDI, Serdang.

VALUE OF CONTRACT: RM18,630.00

CLIENT: PROTON

YEAR:

PROJECT: 

Kerja kerja NCA grounding work TSTR MP, Memasang floodlight & wiring work, Repair high bay & street light at R&D, Add power for IT server room admin office

VALUE OF CONTRACT: RM35,000.00

Fire Protection System


CLIENT: SAPURA MACHINING CORP. SDN BHD

YEAR:

PROJECT:

Replacement master Fire Alarm panel. Supply & Install Co2 Panel. Supply & Install Sprinkler.

Scope of Works Value of Contract
Replacement Master Fire Alarm Panel

Supply & Install Co2 panel

Supply &Install Sprinker

RM 14,433.00

RM 5,516.50

RM 7,500.00

CLIENT: SAPURA BRAKE TECHNOLOGIES SDN BHD

YEAR:

PROJECT:

Repairing Motor Pump horse reel. Control panel & power alarm

Repairing Motor Pump Horsereel

Repairing Control Panel & Fire Alarm Systems 

RM 3,500.00

RM 4,500.00

CLIENT: PROTON

YEAR:

PROJECT:

Services contract for supply new fire extinguisher all Proton Edar Outlet & HQ

Services contract for supply new fire extinguisher all Proton Edar Outlet & HQ 

Supply & Install high dome beacon revolving light

RM 56,880.00 

 

RM 28,900.00

CLIENT: HICOM ASSET MANAGEMENT

YEAR:

PROJECT:

Supply & Install fire rated roller shutter. Sprinkler pipe for fire fighting system

Supply & install fire rated roller shutter 

Springkler pipe for fire fighting system

RM 13,000.00

 

RM 13,550.00

CLIENT: HICOM FACILITY MANAGEMENT BERHAD

YEAR:

PROJECT:

Replacement parts for fire rated door.

VALUE OF CONTRACT: RM 15,230.00

CLIENT: BUKIT JERNEH QUARRY SDN BHD

YEAR:

PROJECT:

Kerja-kerja baIk pulih pendawaian di Kem Kentera Kajang, Selangor.

VALUE OF CONTRACT: RM 8,550.00

Air Conditioning System


CLIENT: SAPURA MACHINING CORP. SDN BHD

YEAR:

PROJECT:

Replacement 12hp Compressor & Service Chemical. Replace Faulty Compressor. Replace Pot door Cobdesor Fan Motor, change compressor oil.

Replacement 12hp Compressor & Services Chemical

Replace Faulty Compressor

Replace Outdoor Condenser Fan Motor, change compressor oil

RM 14,178.00

 

RM 5,083.00

RM4.650.00

CLIENT: JABATAN PELAJARAN WILAYAH PERSEKUTUAN

YEAR:

PROJECT:

Repairing Extinguisher air-conditioning.

Repairing existing air-conditioning RM 17,545.00

CLIENT: PROTON

YEAR:

PROJECT:

Install Exhaust fan. Repair & Service AHU Unit at Mutiara Damansara branch. Repair faulty aircond c/w replace compressor. Dismantle existing aircond. Air supply unit at Painting aircond.

Install Exhaust Fan

Repair & Service AHU Unit at Muatiara Damansara branch 

Repair faulty aircond c/w replace compressor

Dismantle existing aircond

Air supply unit at Painting aircond

RM 26,900.00 

 

RM 28,740.00

RM 19,435.00

RM 4,150.00

RM23,680.00

CLIENT: HICOM ASSET MANAGEMENT BERHAD

YEAR:

PROJECT:

Services contract & chemical cleaning for split unit aircond

Services contract & chemical cleaning for split unit aircond RM 10,260.00

CLIENT: AUTOMOTIVE CONVERSATION ENGINEERING

YEAR:

PROJECT:

Repairing Faulty air Conditioning

Repairing Faulty Air Conditioning RM 3,500.00

M & E Works


CLIENT: BUKIT JERNEH QUARRY SDN BHD

YEAR: 2012-2014

PROJECT :
Extension Toll Plaza Changkat Jering, Perak
Job No. PLB/PMN/N5/UUD/Plaza/2012-0018)


To delivery, supply and install of Electrical & Mechanical System


VALUE OF CONTRACT: RM 1,686,229.00

CLIENT: BJQ INTEGRATED SDN BHD

YEAR: 2014

PROJECT :

Cadangan Membina Sebuah Rumah sesebuah 3 tingkat dengan kolam renang di atas Lot PT 6786, No. 8, Jalan Cecawi 6/6C, Kota Damansara, Mukim Pekan Baru Sq. Buloh, Daerah Petaling, Selangor

Job No. BJQI/P/Cecawi/KylineresourcesSB/LA/001


To delivery, supply and install of Electrical & Mechanical System for Low Voltage Electrical System


VALUE OF CONTRACT: RM 163,620.00

CLIENT: RICHWORK GROUP SDN BHD

YEAR: 2015

PROJECT :

Cadangan Pembangunan Sebuah Kolej Dr Azizan Osman di Lot 5, 6 dan 7 di Precint Alami , Seksyen 12, Selangor Darul Ehsan

Job No. KYLine/M&E/LA/2015


To delivery, supply and install of Electrical & Mechanical System for Low Voltage Electrical System


VALUE OF CONTRACT: RM 120,500.00

CLIENT: TURBINE GROUP SDN BHD

YEAR: 2015

PROJECT :

PROPOSED FOURTH LANE WIDENING BETWEEN SHAH ALAM INTERCHANGE (KM8.9 NKVE) AND SUNGAI BULOH (KM457 NSE) – PACKAGE A

Job No. Turbine/KYLine/PO/2015


To delivery, supply and install of 2 way 100mm dia GI Duct (Class B) in trench along the verge of the expressway, at Southbound, depth to invert not exceeding 1.5mm including joint, 6mm draw in wire, trenching, sand bedding, surround, backfull, compaction and disposal of surplus material as per drawing


VALUE OF CONTRACT: RM 150,000.00

CLIENT: RICHWORK GROUP SDN BHD

YEAR: 2015

PROJECT :

Cadangan Tambahan dan pindaan kepada sebuah rumah bungalow dua tingkat setengah yang sediada di No. 24, Jalan Kelab Golf 13/5, Green Meadow, Seksyen 13, 40100 Shah Alam, Selangor Darul Ehsan

Job No. KYLine/Renovation Work/LA/2015


To delivery, supply and install of Civil & Structure Works


VALUE OF CONTRACT: RM350,500.00

M & ELECTRICAL WORKS (PPU)


CLIENT: SOLE RESOURCES SDN BHD

YEAR: 2016

PROJECT :

Cadangan Membina 1 Unit Pencawang Pembahagian Utama (PPU) 2 Tingkat Berserta 1 Unit Pondok Pengawal Bagi Pembangunan Perniagaan Dan Perumahan Serentak Dengan Pembangunan Berstrata Di Bawah Hak Milik 1985 Pt 52091, Pt 52092 Di Bandar Baru Lembah Selatan, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan (Southville City)


Job Scope: M & E Electrical Works


VALUE OF CONTRACT: RM696,791.00

CLIENT: SOLE RESOURCES SDN BHD

YEAR: 2016

PROJECT :

Cadangan Membina 1 Unit Pencawang Pembahagian Utama Bagi Pembangunan Skimgated Di Bawah Seksyen B (1a) Akta 318 (Akta Hakmilik Strata 1985) Di Atas Lot Pt 2104, Bandar Kundang, Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan Untuk Tetuan Major Land Development Sdn Bhd (M-Residence 2)


Job Scope: M & E Electrical Works


VALUE OF CONTRACT: RM684,484.40

Renovation Works


CLIENT: RICHWORK GROUP SDN BHD

YEAR: 2015

PROJECT :

Cadangan Tambahan dan pindaan kepada sebuah rumah bungalow dua tingkat setengah yang sediada di No. 24, Jalan Kelab Golf 13/5, Green Meadow, Seksyen 13, 40100 Shah Alam, Selangor Darul Ehsan

Job No. KYLine/Renovation Work/LA/2015


To delivery, supply and install of Civil & Structure Works


VALUE OF CONTRACT: RM450,500.00

CLIENT: DATOK WAN MOHD ZAIN BIN WAN ISMAIL No. 5, Lorong SS 7/4E Kelana Jaya Selangor Darul Ehsan

YEAR: 2015

PROJECT :

Kerja Kerja Ubahsuai Rumah Jenis Semi-D Di No. 5, Lorong Ss7/4e, Kelana Jaya, Selangor Darul Ehsan


To delivery, supply and install of Renovation Works


VALUE OF CONTRACT: RM120,500.00

EN AZUAN BIN HUSSAIN No. 12, Lorong Cakera Purnama 12/18 Seksyen 12, Bandar Puncak Alam 42300 Kuala Selangor

YEAR: 2015

PROJECT :

Kerja Kerja Ubahsuai Rumah No. 12, Lorong Cakera Purnama 12/18, Seksyen 12, Bandar Puncak Alam, Selangor Darul Ehsan


To delivery, supply and install of Renovation Works


VALUE OF CONTRACT: RM109,000.00

CLIENT: TURBINE TECHNIQUE (M) SDN BHD No. 21, Jalan Uranus U5/AJ Seksyen U5, Shah Alam Selangor Darul Ehsan

YEAR: 2015

PROJECT :

Kerja Kerja Ubahsuai Rumah No. 37, Lorong Lautan Samudera 9/3, 42300 Bandar Puncak Alam, Selangor Darul Ehsan


To delivery, supply and install of Renovation Works


VALUE OF CONTRACT: RM35,000.00

Electrical Works


CLIENT: HCM ENGINEERING SDN BHD

YEAR: 2016

PROJECT :

The Proposal Addition Of A 4 Storey Office Building With Basement Car Parking To The Existing Facilities On Lot 38627 And Lot 36462 Bukit Jalil, Mukim Daerah Petaling Jaya


Temporary Electrical supply And Temporary water supply


VALUE OF CONTRACT: 

  • RM35,000.00
  • RM 15,000.00

CLIENT: IRRIGATION GOLD SDN BHD

YEAR: 2016

PROJECT :

Cadangan Membina 1 Unit Pencawang Pembahagian Utama 2 Tingkat Beserta 1 Unit Pondok Pengawal Bagi Pembangunan Perniagaan Dan Perumahan  Serentak Di Southville City, Daerah Sepang, Bandar Baru Lembah Selantan, Selangor Darul Ehsan


Job Scope: TNB HV/LV Cabling


VALUE OF CONTRACT: RM212,000.00

CLIENT: HCM ENGINEERING SDN BHD

YEAR: 2016

PROJECT :

To supply labours, tools and machineries to re-locate existing remote panel and switch panel for HT 11kV switching at new position. Work to include to re-lay cable and commissioning and being troubleshout and making good for Main Hydrant Pillar – AFC HQ


Job Scope: M &  Electrical  Works


VALUE OF CONTRACT: RM70,000.00

CLIENT: SERIBU RATA ENTERPRISE SDN BHD

YEAR: 2016

PROJECT :

The Proposed Repairing, Troubleshoot And Making Goods By Delivery, Supply And Install Opened Reassemble With New Led Utility T8 Tube C/W With Accessories Of Signboard At Pos Besar Kuala Lumpur


Job Scope: L8 Lighting _ Signboard


VALUE OF CONTRACT: RM35,000.00

M & Street Lighting System & Traffic Light System


CLIENT: HCM ENGINEERING SDN BHD

YEAR: 2016/2017

PROJECT :

Cadangan Pembinaan Jalan Penghubung Di Antara Jalan Kelang Lama Dan Lebuhraya Pantai Baru (NPE) Melalui Jambatan Menyeberangi Sungai Kelang Untuk Tetuan Gapurna Land Sdn Bhd


Job Scope: Street Lighting System & Traffic Light Systems


VALUE OF CONTRACT: RM1,100,000.00

Cold & Hot Water System & Internal sewerage System & MISC Works


CLIENT: BJQ INTEGRATED SDN BHD

YEAR: 2014

PROJECT :

Cadangan Membina Sebuah Rumah sesebuah 3 tingkat dengan kolam renang di atas Lot PT 6786, No. 8, Jalan Cecawi 6/6C, Kota Damansara, Mukim Pekan Baru Sq. Buloh, Daerah Petaling, Selangor

Job No. BJQI/P/Cecawi/KylineresourcesSB/LA/001


To delivery, supply and install of Cold & Hot Water System, Internal Hot Water System, Internal Sewarage System and MISC works


VALUE OF CONTRACT: RM 125,275.00